Quick answer: what is a hygienic wall cladding system?

A hygienic wall cladding system is not just a sheet of PVC or stainless steel fixed to a wall. It is a complete assembly of panels, joint trims, corner profiles, adhesive and sealant that together form one continuous, sealed surface with no exposed edges, open joints or gaps for dirt and moisture to collect in. The panels themselves matter, but it is the trims, corners and jointing method holding the system together that usually determine whether an installation stays genuinely hygienic for years or starts failing at the seams within months. Talk to the Jemiclad team about specifying a system for your project.

What Is a Hygienic Wall Cladding System, and How Is It Different From a Single Panel?

Buyers researching hygienic cladding often focus on the panel itself, its colour, finish or thickness, without realising that the panel is only one part of what gets installed. A finished wall is a system made up of several distinct parts working together:

 

  • Wall panels, usually rigid PVCu sheet or stainless steel, forming the main covered area
  • Joint trims, which cover and seal the vertical seams between adjoining sheets
  • Edge trims, which finish exposed panel edges where cladding meets a different surface or material
  • Internal and external corner trims, which turn a corner without leaving an open joint
  • Adhesive, which bonds the panel to the substrate behind it
  • Sealant or finishing silicone, which closes any remaining gaps at junctions
  • A jointing method, either mechanical trims or hot welding, which determines how watertight the finished seams are
  • Vinyl trims that join the wall to floor and other flooring methods we have on our architectural drawings

 

Miss or skimp on any one of these and the panel’s own hygiene properties count for far less. A perfectly smooth, wipeable PVC sheet with an unsealed edge trim or a poorly bonded corner still leaves a route for moisture and bacteria to get behind the surface.

What Components Make Up a Jemiclad Wall Cladding System?

Jemiclad’s own component range, published on our components page, breaks a full system down into the following parts.

 

ComponentWhat It Does
Jemifix all-over adhesive (two-part epoxy or one-part water-based)Bonds panels to the substrate; the two options suit different wall types and site conditions
Joint trimCovers and seals the joint between two adjoining sheets
Edge trim Finishes an exposed panel edge cleanly
Vinyl transition trimManages the change between cladding and another floor or wall material
Internal corner trim (preformed, with 6 inch returns)Forms a sealed internal corner without an open joint
External corner trim (preformed, with 6 inch returns)Forms a sealed external corner and protects the panel edge from impact
Jemiclad weld rodUsed for hot welding panels into one continuous, seamless surface instead of trim jointing
Jemiclad thermoformerHeat-forms panels around corners and windowsills for a genuinely seamless, joint-free finish in the areas that need it most
Finishing silicone (low modulus caulk)Seals remaining gaps at junctions such as ceiling lines or service penetrations
Jemifix tapeDouble-sided foam tape used for positioning and temporary fixing during installation

 

Two of these, heat wealding and thermoforming work together to create a seamless, integrated hygienic system. 

Hot Welded Joints vs Trim Jointed Systems: What’s the Difference?

Both methods are used across UK hygienic cladding installations, and the right choice depends on the environment, the layout and what your installer specifies for that particular job rather than one method being universally better.

 

FactorHot Welded JointsTrim Jointed System
Finished jointContinuous, fused seam with no visible trimVisible trim strip covering the joint
Best suited toHigh-hygiene, constant washdown areas such as production lines and clinical roomsGeneral commercial and retail environments where a trim finish is acceptable
CornersThermoformed for a seamless systemPreformed corner trim with sealed returns
InstallationRequires a trained installer and the correct weld rod and thermoformerRequires a trained installer and correctly cut, sealed trims
RepairabilityA damaged weld typically needs a matching skilled repairA damaged trim section can often be replaced individually

 

Neither approach is automatically the right call for every wall. A busy production kitchen with round-the-clock washdown and an NHS clinical room with occasional deep cleans do not necessarily need the same jointing method, which is why this is a decision worth making with your installer rather than assuming one option is always correct.

What Do UK Regulations Actually Say About Wall Systems, Not Just Materials?

UK food hygiene and healthcare guidance is written around the finished wall, joints included, not just the panel material.

 

The Food Standards Agency’s guidance for food businesses states plainly that “floors and walls must be maintained in good condition, easy to clean, disinfected, smooth, hard-wearing, washable and in a good state of repair,” a standard that traces back to Regulation (EC) No 852/2004 on the hygiene of foodstuffs, retained in UK law, which requires wall surfaces in food areas to be impervious, non-absorbent, washable and non-toxic, with adequate sealing where walls meet floors and other walls. A sheet of compliant PVC fixed with an open, unsealed joint does not meet that standard even though the panel itself does.

 

The BRCGS Global Standard for Food Safety takes the same view from an audit perspective. Clause 4.4.1, covering the condition and cleaning of walls, is consistently one of the most common non-conformities BRCGS auditors raise, and clause 4.6.2 sets out hygienic design principles for surfaces and joints, including the use of correct seals, impervious surfaces and smooth welds. In both cases, the finding is rarely “wrong material.” It is usually a failed seal, an open trim, or a joint that was never properly closed.

 

This is the practical reason to think about hygienic cladding as a system during specification, rather than choosing a panel colour first and treating trims and jointing as an afterthought once the order is placed.

Do You Need Coving as Well as Wall Cladding?

Coving, a curved profile fitted at the junction between a floor and a wall, is a related but separate detail from the wall cladding system itself. It exists to remove the sharp internal angle where a flat wall meets a flat floor, a point that is otherwise difficult to clean thoroughly and where dirt and moisture tend to collect. Many hygienic specifications for kitchens, laboratories and clinical areas call for coving at floor level in addition to wall cladding above it. There are several different methods for forming this wall-to-floor junction, and the various options are set out in the architectural and CAD drawings we linked to at the start of this article, which is the best place to see how each approach works in detail. 

How Do These Components Come Together During Installation?

At a high level, installing a full hygienic wall cladding system follows the same sequence regardless of which components are specified: the substrate is prepared so it is clean, dry and sound, panels are measured and cut to fit, adhesive is applied to bond the panel to the wall, and the joints, corners and edges are then finished using either trims or hot welding depending on the specification. Our installation guide covers this process step by step, and our dedicated installation page has more detail on Jemiclad’s certified installer programme.

Choosing the Right System for Your Sector

The right combination of panel, trim and jointing method varies by environment. A few examples from sectors we work in regularly:

 

  • Commercial kitchens often specify PVC ranges such as Sureclad alongside stainless steel or checker plate at cook lines and impact zones. See our guide to hygienic wall cladding for commercial kitchens
  • Food and drink manufacturing sites, including central production units, often need hot welded joints across large continuous wall runs to withstand constant washdown, as in our Condimaniac central production unit project
  • Hospitals and healthcare settings generally specify systems that meet NHS Health Building Note requirements for seamless, impact-resistant surfaces, covered in our hospital cladding guide
  • Schools, care homes, laboratories, gyms and car washes each bring their own mix of impact, moisture and chemical exposure, which we cover in our sector guides for schools, care homes, laboratories, gyms and car washes

 

For a wider look at the factors that go into choosing a material in the first place, our guide on how to choose the right hygienic cladding for your business and our stainless steel vs PVC comparison are good next reads.

Frequently Asked Questions

What is a hygienic wall cladding system? It is the complete assembly used to clad a wall to a hygienic standard: the panel itself plus the joint trims, corner profiles, adhesive and sealant, or the hot welding, that join everything into one continuous, sealed surface.

 

Do I need trims if my panels are heat welded? Not on the flat joints, since welding fuses those seams directly. Preformed corner trims or thermoformed corners are still commonly used or specified at corners and edges depending on the layout of the room.

 

What is Jemifix adhesive used for? Jemifix is Jemiclad’s adhesive range for bonding wall panels to the substrate. It is available as a two-part epoxy or a one-part water-based formula, with the right choice depending on the wall type and site conditions rather than one being universally better.

 

Can trims and components be colour matched to the panels? Trims are generally supplied to complement the panel finish. Ask your Jemiclad contact about matching options for your chosen range when you request samples.

 

What thickness of panel should I choose for my system? Jemiclad’s PVC ranges are available in 1.8mm, 2.3mm and 2.5mm. All three are suitable depending on what your installer or specifier recommends for the project, the substrate and the level of impact the wall will see, rather than one thickness being universally the best choice.