  3. Specifying Seamless Hygienic Cladding: CAD Details for Thermoformed Corners and Hot Welded Joints

Specifying Seamless Hygienic Cladding: CAD Details for Thermoformed Corners and Hot Welded Joints

A hygienic wall is only as hygienic as its joints. Panel-to-panel seams, internal and external corners and the junction with the floor are where moisture collects, where cleaning chemicals cannot reach and where bacterial growth starts. In healthcare, food processing and cleanroom projects, those three details decide whether a wall protection system passes an infection control audit or fails it.

This guide explains how to specify Jemiclad seamless hygienic cladding so the detail that gets built is the detail you drew. It covers the NBS specification criteria for hot welded joints versus 2-part drive-in trims, the CAD callouts to include for site-thermoformed corners, the coved base transition to safety vinyl flooring, and where to download Jemiclad’s CAD detail pack in PDF on our website.

Jemiclad supplies a full range of jointing trims and does so on many projects. The point of this article is that where cleanliness is critical, a seamless install removes the trim altogether, and the specification should say so in terms a contractor cannot misread.

Hot welded joints vs 2-part drive-in trims

Jemiclad panels can be joined in two ways. Both are shown in the installation details and both have a place, but they behave very differently once the wall is in service.

2-part drive-in trim (PVC division bar / H-trim). A retainer base trim is fixed behind the first panel with a bead of sealant, the second panel is set in, and a front cover trim is tapped into the base with a rubber mallet. It is quick, forgiving of substrate movement and ideal for dry, lower-risk areas such as back-of-house corridors, stores and plant rooms.

Hot welded joint. Panels are installed 25mm over a Jemifix welding tape bonded to the substrate, with a precisely controlled gap of approximately 2mm (the width of a 20p coin, 1.8mm) between them. The gap is grooved, then fused with a colour-matched PVC weld rod that is trimmed flush with a Mozart knife. The result is a single, continuous sheet with a chemical bond at the seam.

Why architects specify hot welding in washdown environments

  • A mechanical trim has a lip. Behind that lip, high-pressure washdown, condensation and cleaning fluids can be trapped and cannot be reached by routine cleaning.
  • A welded seam has no lip, no void and no sealant line to shrink, discolour or support mould growth.
  • The weld is the same homogeneous PVC as the panel, so chemical resistance at the joint matches the panel face.
  • There is no visible break in colour, which matters in patient-facing spaces.
CriterionHot welded joint2-part drive-in trim
Joint profileFlush, continuousRaised cover trim with lip
Dirt and moisture retentionNonePossible behind the lip
Suitable for high washdownYesSemi-dry areas only
ColourMatching weld rod, near invisibleMatching trim, visible line
Movement toleranceNot for structural joints (use cold weld detail)Accommodates minor movement
InstallerJemiclad-certifiedAny competent installer
Typical useTheatres, clinical rooms, food processing, cleanroomsCorridors, stores, dry back-of-house

Where a project includes a structural expansion joint, neither method applies across it: Jemiclad details call for the panel to stop 100–150mm short and for a cold weld (sealant) detail instead.

NBS specification criteria: what the clause needs to say

A hygienic cladding specification that only names the product leaves the jointing method to the contractor, and the contractor will usually price the trim. To get a seamless installation, the NBS clause for the wall lining system should state each of the following, and Jemiclad’s NBS Guidance on the technical documents page gives the figures to drop in.

  1. Manufacturer and product. Jemiclad hygienic wall cladding, e.g. Jemiclad Pro, 2.5mm homogeneous PVC sheet, 1220 x 2440mm or 1220 x 2500mm; or PVC Free One from the CleanScape Series where PVC-free is required.
  2. Performance. Fire: BS 476 Part 7 Class 1 surface spread of flame, BS 476 Part 6 Class 0 fire propagation, ASTM E84 Class A for US projects. Water absorption less than 0.08% after 7 days (DIN EN ISO 62). Chemical resistance per the Jemiclad resistance tables.
  3. Substrate. Level to within 3mm over 2m, dry, dust-free, primed where required; the Jemiclad substrate guidance sets out acceptable boards and preparation.
  4. Adhesive. Jemifix 2-part or Jemifix 1-part water-based, by substrate, applied with the notched trowel size stated in the guidance.
  5. Jointing method. “Panel joints: hot welded with manufacturer’s colour-matched PVC weld rod over Jemifix welding tape, joint gap 1.8–2mm, trimmed flush. 2-part division bars are not permitted in [listed areas].” This single sentence is the difference between a seamless wall and a trimmed one.
  6. Corners. “All internal and external corners to be site-thermoformed from the panel using the manufacturer’s thermoformer by a installer. Plant-on corner trims are not permitted.”
  7. Floor junction. Either flash cove overlap, cove former with capping seal, welded to safety vinyl, or trim to resin, as the wet-area classification demands (see below).
  8. Installer. Jemiclad-certified installer, with the thermoformer brought to site.
  9. Cleaning and maintenance. In accordance with the Jemiclad cleaning guidelines, which should be handed over in the O&M manual.

Writing the jointing and corner clauses as prohibitions (“not permitted”) rather than preferences removes the most common value-engineering substitution on hygienic cladding packages.

Thermoformed internal and external corners: the CAD callouts

Vertical corner joints are the single most common point of failure in hygienic cladding. A plant-on corner trim adds two more edges, two more sealant lines and a cavity behind the trim, right where trolleys, beds and cleaning equipment make contact. Thermoforming removes the trim and the joint entirely.

On a Jemiclad project, a certified installer brings the Jemiclad thermoformer to site and fabricates every internal and external corner from the panel itself. The sheet is heated along a line, bent to the measured angle and bonded in place, so the corner is one continuous piece of PVC from wall to wall.

The Jemiclad CAD detail Thermoformed Inside and Outside Corners carries the callouts an architect needs to draw and check the detail:

  • Internal coved radius. The internal bend is formed as a cove rather than a sharp 90-degree fold, giving a radiused inside corner that a cloth or mop head can follow with no crevice.
  • External corner return dimension. The distance the panel returns past the corner before the next joint, so the first weld seam sits away from the impact zone.
  • Backing substrate tolerance gap. The allowance between the formed corner and the substrate, which lets the panel sit true where the wall is not perfectly square and keeps the adhesive bed consistent.
  • Weld location. Where the corner piece is welded to the adjoining flat panels, shown as a hot welded joint, not a trim.

Because the corner is formed on site, it follows the building as built, not as drawn. That is why the detail is specified as “site-thermoformed” rather than as a prefabricated component.

Coved base details: the vinyl flooring transition

The floor-to-wall junction is the last gap to close. Jemiclad publishes four floor details in its CAD pack, and the right one depends on how wet the room gets.

Flash cove overlap (wet areas). Safety vinyl is taken up the wall on a cove former to around 50mm above the specified flash cove height, with a clean edge and no capping. The thermoformed Jemiclad panel is then installed down over the vinyl, overlapping it by around 50mm, and sealed with a 15mm bead of clear Jemifix sealant to the back edge. Water running down the wall runs over the lap and onto the cove, never behind it. Jemiclad describes this as a must for showers, sluices, washdown rooms and processing areas.

Cove base with cove former and capping seal. Where Jemiclad runs to the floor, the flooring contractor installs the cove former, vinyl and capping strip against it. This gives the familiar coved skirting while the wall above stays seamless. The flooring contractor specifies the cove base, capping trim and adhesive.

Welded to safety vinyl. For a fully fused floor-to-ceiling envelope, Jemiclad is installed first, then 2mm PVC sheet flooring is brought up flush using the Jemiclad flash cove kit, with a 1.8mm gap that is hot welded and trimmed almost flush. Wall and floor become one welded surface.

Vinyl trim (semi-dry areas). A Jemiclad vinyl trim gives the flooring contractor a capping to tuck the sheet vinyl into. Jemiclad’s own guidance is that if there is any concern about water, the overlap detail should be used instead.

Specify the detail by name on the drawing (“Jemiclad Flash Cove Overlap Detail”) and the wet-area classification it applies to, so the flooring and cladding packages are coordinated before either contractor is on site.

Request the Jemiclad CAD detail pack 

Every detail described above is available as a drawing on the Jemiclad Technical Documents page, alongside the NBS Guidance, architects’ line drawings, data sheets and installation, substrate and cleaning guidelines.

The CAD drawings currently published are:

  • Jemiclad Hot Welded Joint
  • Jemiclad Cold Welded Joint Detail (mastic)
  • Jemiclad Thermoformed Inside and Outside Corners
  • Jemiclad to Door Architrave or Door Frame
  • Jemiclad Flash Cove Overlap Detail
  • Jemiclad Overlap to Floor, 3.175mm and 6.350mm versions
  • Jemiclad to Floor, Metal Trim Detail

 

Specify the joint, not just the panel

Seamless hygienic cladding is an installation method as much as a product. Hot welded joints, site-thermoformed corners and a correctly chosen coved base turn a washable panel into a continuous, infection-control-ready surface, but only if the specification and the drawings say so explicitly.

Use the Jemiclad CAD details and NBS guidance to write those clauses, and talk to our technical team early on healthcare, food and cleanroom projects. We can review your wet-area schedule, confirm the right floor detail for each room and connect you with a certified installer who brings the thermoformer to site.

Request samples or get in touch to discuss your specification.

Frequently asked questions

What is the difference between a hot welded joint and a 2-part trim on hygienic cladding? A hot welded joint fuses two panels with a colour-matched PVC weld rod in a 1.8–2mm groove, leaving a flush, continuous surface. A 2-part drive-in trim covers the joint with a raised H-profile that can trap moisture and dirt behind its lip, so it is reserved for semi-dry areas.

What are thermoformed corners? Thermoformed corners are internal and external corners formed on site by heating and bending the cladding panel itself, so there is no corner trim and no vertical joint. They are specified as “site-thermoformed” and installed by a certified installer with a thermoformer.

What should an NBS clause for hygienic wall cladding include? Manufacturer and product, sheet thickness and size, fire and water absorption performance, substrate preparation, adhesive, jointing method (hot welded, with trims prohibited where required), corner method (site-thermoformed), floor junction detail, installer certification and cleaning regime.

Which coved base detail should I use with safety vinyl flooring? For wet areas, use the flash cove overlap detail where the cladding laps over the vinyl cove by around 50mm. For semi-dry areas, a cove former with capping seal or a vinyl trim is acceptable. For a fully fused envelope, the cladding can be hot welded directly to 2mm PVC sheet flooring.

Can I download Jemiclad CAD details? Yes. CAD drawings for hot welded joints, thermoformed corners, floor junctions and door frames are available on the Jemiclad Technical Documents page, together with NBS guidance and data sheets.